 | Locate an acceptable site location while working with
your RF engineer. |
 | Negotiate the lease terms with the property owner. |
 | Obtain the local governmental approvals as required by
the location; CUP, variance, etc. |
 | File and obtain FAA approval via forms 7460-1 and -2. |
 | Obtain state aeronautics approval as required. |
 | Obtain acceptable EPA/NEPA report. |
 | Obtain SHPO approval. |
 | Obtain a geotechnical report for the foundation design. |
 | Obtain a record of survey and legal description for the
leased property. |
 | Obtain the foundation design for the tower. |
 | Obtain A/E drawings for submittal to the local
permitting agency. |
 | Obtain building permit. |